A factory audit for elderly care products is scored on three inspection stages and five test reports, not on the building. If a supplier cannot produce a batch record for the model being quoted, the audit ends there regardless of what the tour showed.
What Should the Audit Cover Before the Line?
The incoming stage decides whether the audit continues, because material that cannot be traced makes every later check a sample of unknown origin.
Start with the receiving record for the exact tube, wheel or fabric used in the quoted model. A record with a supplier name, a lot number and a date is a working document; a delivery note without a lot number is a receipt.
Nonconforming material is the second thing to look at. Every audit finds a quarantine area; the question is whether anything in it has a tag with a decision on it. Material without a decision is material waiting to return to the line.
Environment is worth thirty seconds. Aluminium and steel stored in a damp corner develop the corrosion that a salt spray report later fails to explain, and the audit can see the corner in a minute.
Then follow one lot to the line. This single walk answers whether the receiving record is used or merely filed.
Calibration is the fastest tell in the whole audit. Ask to see the gauges or torque tools used at final check, and the record of when they were last verified. Uncalibrated instruments produce numbers that look like data.
The table below is the pre-line section of a working checklist, with the evidence each line requires.
| Check | What to look at | Evidence required |
|---|---|---|
| Receiving | Tube, wheel and fabric lots | Lot number and date |
| Traceability | One lot followed to line | Line record matching lot |
| Calibration | Gauges and torque tools | Verification label and log |
| Storage | Material condition and segregation | Location and condition note |
Source: SunnyPeak Care supplier onboarding terms, 2026 (company statement)
A checklist without an evidence column becomes a memory exercise. The column is what makes an audit repeatable by a second auditor six months later.
Which In-Process Checks Prove Control?
In-process checks prove control when they can stop a run, and they only stop a run when someone is authorised to do it without asking the office.
Ask what the operator does when a weld fails the visual check. An answer that names a person, a stop and a rework record describes control; an answer about reporting to a supervisor describes escalation without authority.
Sampling tells you whether the check is statistical or ceremonial. A plan that names a standard, a sample size and an acceptance number is a working plan; a plan that names only an inspection frequency is a habit.
The three stages below are the spine of the audit, and each one has a different failure mode.
| Stage | What it covers | Typical failure |
|---|---|---|
| Incoming | Material identity and condition | No lot traceability |
| In-process | Weld, assembly, adjustment | No stop authority |
| Final | Function, load, packaging | Sampling without a plan |
Source: SunnyPeak Care supplier onboarding terms, 2026 (company statement)
Final check is where buyers over-trust a photograph. A picture of a pallet proves the pallet exists, not that a sampling plan was applied to it.
Final check also has to be independent of the line it checks. When the same supervisor signs production output and final inspection, the second signature adds no information, and an audit that records both without noting the overlap has missed the finding.
Rework records are the last in-process item. A factory that reports zero rework either has a perfect process or no record of it, and the second is far more common than the first.
Which Five Tests Should Appear in the File?
Five tests carry most of the evidence for a walking aid, and each answers a different question about how the product fails in use.
Load testing answers whether the frame holds the rated user weight with a margin. Fatigue testing answers whether it still holds after repeated cycles. Salt spray answers whether the finish survives humidity in transit and storage.
Dimensional testing answers whether the parts you receive will fit the accessories you ordered. Drop testing answers whether the packaging protects the unit through the last mile rather than only to the port.
The table below maps each test to the failure it predicts, which is how a buyer decides which reports to request first.
| Test | Failure predicted |
|---|---|
| Load | Frame collapse under rated weight |
| Fatigue | Loosening at joints over time |
| Salt spray | Corrosion after transit |
| Dimensional | Parts that do not fit |
| Drop | Damage in the last mile |
Source: SunnyPeak Care supplier onboarding terms, 2026 (company statement); applicable walking-aid product standards per destination market (clause numbers not verified)
Reports also carry a date and a model. A report without both is a marketing document, and a report for a sibling model does not transfer without a documented equivalence argument.
How Do You Score an Audit Without Bias?
Scoring works when the marks come from evidence rather than from the tour, so each line should be worth a fixed number and require a document to earn it.
A workable structure is three bands per line: present and current, present but stale, absent. The middle band matters most, because it is where most factories actually sit and where buyers routinely award full marks.
A second auditor should reach the same score from the same file, which is the test of a checklist rather than of an auditor. If two people disagree by more than a band, the wording of that line is the problem.
The bands also give the buyer a negotiating position that is factual rather than personal. Saying that calibration records are stale by nine months is a finding; saying the factory feels disorganised is an opinion, and opinions are answered with reassurance.
Weighting matters as much as scoring. A missing batch record should cost more than a missing wall chart, and a checklist that treats them equally produces a high score for a factory that cannot trace its own output.
The last section of a good audit is not a score but a list. Three findings, each with an owner and a date, will change behaviour more than forty observations collected in a morning and filed afterwards.
What Does a Passing Audit Look Like?
A passing audit is not a high score; it is a file that a second person could audit again without you and reach the same conclusion. Three signs separate that kind of file from a good tour.
The first is that a findings list exists before you ask for it. A factory producing its own last internal audit, with dates and closures, is running a system; one producing a certificate is holding a document.
The second is that the batch record you were shown is the one that ships. Ask for the record of the order in production today rather than the model sample, then compare its lot numbers with the material in the corner.
The third is that the answer to a hard question arrives with a date. A promise to fix something is a courtesy; a jig replaced on a stated day and calibrated on arrival is a plan.
Score on those three and the percentage becomes secondary. A 70 with a findings list and owners is more useful than a 95 with no records.
Keep the number for comparison between suppliers rather than as a threshold. Two sites need one shared measure, and that measure only earns its place when the lines behind it are evidence-based and weighted the same way on every visit.
Repeat the audit with the same form. A checklist that changes between visits measures the auditor's mood rather than the factory's system, and the second visit is where most of the value sits.
Frequently Asked Questions
Can an audit be done remotely?
Partly. Records, calibration logs and test reports travel well over a video call, but line discipline does not. Use remote review to shorten the on-site visit, not to replace it.
How many batch records should I ask for?
Three is enough to show a pattern, drawn from different months rather than the same week. One record proves an occasion, and three prove a habit.
Should I audit the factory or the trading company I buy from?
Audit the site that makes the product, and hold the counterparty you contract with responsible for arranging it. An audit of an office tells you about the office.
What score should disqualify a supplier?
There is no universal threshold, but any zero on traceability or calibration should stop the order regardless of the total, because those two failures make the remaining marks unreliable.
How often should the audit repeat?
Annually for a stable supplier, and after any change of production site, ownership or critical component. The second trigger matters more than the calendar.
What This Guide Does Not Cover
This guide does not certify any factory, replace a notified body assessment, or score a supplier on your behalf, and it does not cover social compliance audits, which examine labour and management systems rather than product inspection. It does not substitute for the test standards applicable to your market.
For the product families these checks apply to, start with the rollator walkers series. The document chain behind a compliant order is described in our quality and compliance documentation. Send the model list and audit date to request a quote; we reply within one business day.