What Should a Supplier Be Asked to Prove?
Every claim a supplier makes either has a document behind it or it does not, and selection is the work of matching the two rather than collecting brochures.
Capacity claims become checkable when they name sites and process steps. A supplier that can describe the chain from tube forming to final assembly, and name the plants it runs through, is answering a different question from one that forwards a photograph of a warehouse.
Quality claims become checkable when they name stages. Incoming inspection, in-process inspection and final inspection exist as records or they exist as a sentence, and one recent record per stage settles which it is inside a day.
Compliance claims become checkable when they name the holder. A certificate belongs to a legal entity and a scope, and only that entity can answer for it, so reading the holder's name is the first act of verification rather than a formality.
A useful habit is to ask for the claim in writing, with the document that supports it, and to note the date. A shortlist built that way falls to two or three candidates quickly, because a supplier without the file cannot produce it under time pressure, and a supplier that produces it without being asked has usually been through this before.
Put the same four requests to every candidate, in the same order, and keep the replies in one file. Comparison becomes possible only when the questions were identical, and most tender mistakes begin with a different question asked of each supplier.
| Claim | Evidence to request | What it settles |
|---|---|---|
| Capacity | Site list, process steps | Who makes the product |
| Quality | One record per inspection stage | Whether the stages run |
| Compliance | Certificate, holder, scope | Who answers for it |
| Customisation | Drawing and sample record | What may change |
Source: SunnyPeak Care supplier qualification framework, 2026 (company framework)
How Does a Factory Differ From a Trader?
The distinction that matters is not the label a company uses but where the decisions sit, and two of those decisions carry most of the weight for a buyer.
The first is who writes the specification that the product is later inspected against. When the same organisation designs, specifies and inspects, a deviation has an owner internally; when goods are bought finished and resold, the specification often travels by photograph.
The second is who holds the certificates and who answers a claim. A supplier working through partner plants should state the scope per product and per order, and should name the function that signs a defect rather than the sales contact who took the enquiry.
The full comparison, including how the price build-up differs between the two models, is set out in our guide to trading companies and manufacturers in elderly care.
Both models can deliver a good order, and the difference shows when something goes wrong, which is why these questions are about ownership rather than capability.
| Question | Integrated supplier | Trader |
|---|---|---|
| Capacity | Named plants, full chain | Sub-supplier unknown |
| Certificate holder | Partner plants, scoped | Seldom disclosed |
| Claim owner | Named function | Sales contact |
| Quote basis | Material, process, packing | One figure |
Source: SunnyPeak Care OEM/ODM project terms, 2026 (company statement)
Which Documents Prove Compliance?
Compliance is proved per product and per market, so a buyer needs three documents in hand and needs to know what each one actually covers.
For the United States, the usable statement is establishment registration and device listing held by the manufacturing partners and provided per product and order scope. Any supplier that writes approval where registration belongs is describing something it does not hold, and that alone is a reason to keep looking.
For the European Union, a device in scope carries CE marking under EU MDR 2017/745 per product group, with an EU Declaration of Conformity issued for that group. A declaration that names a group the ordered product is not in is not evidence for the order, however recent its date.
For the quality system, ISO 13485:2016 certification is held by the manufacturing partners with the scope stated per product. It describes a system rather than a product, which is why the scope line deserves reading before the certificate number.
Australia and India are registration pathways in progress at the time of writing, which is a reason to plan that step into a launch rather than to describe either market as registered.
Two of those three deserve a closer read than a hub page can give. The conformity route and what a declaration must contain are worked through in our guide to EU MDR and CE marking for walking aids, and the registration records that back a US claim are set out in the guide to verifying an FDA registration.
| Document supplied | What it shows | Verify with |
|---|---|---|
| Registration copy | Listing matches product | FDA database |
| Declaration of conformity | Product group in scope | Signatory and group |
| ISO 13485 copy | Scope line and site | Issuing body register |
Source: SunnyPeak Care, 2026 (company statement)
What Does a Site Audit Add?
An audit answers the one question documents cannot, which is whether the process written down is the process running, and the quickest way to answer it is to follow a single order through the plant.
Watching incoming inspection tells a buyer how rejects are treated, watching the functional checkpoint tells them whether anyone can stop the line, and watching final testing tells them what evidence a shipment leaves with. A plant that cannot trace a finished unit back to material and date cannot defend it a year later.
Whoever attends should carry the purchase order rather than a blank template, because the questions that matter are the ones this order raises. The checklist itself, stop by stop and with the evidence to ask for at each one, is in our guide to the factory audit for elderly care suppliers.
An audit also has a limit worth naming. It samples, so it reports what was true on the day and at the stops chosen, and a buyer who treats one visit as a permanent verdict will be surprised in the second year.
| Stop | Shows | Ask for |
|---|---|---|
| Incoming | How rejects are handled | Last batch record |
| In-process | Whether a line can stop | Checkpoint authority |
| Final test | What ships with goods | Report and edition |
| Traceability | Whether a claim is answerable | Lot to material |
Source: SunnyPeak Care audit checklist, 2026 (company framework)
Frequently Asked Questions
How many suppliers should a buyer compare?
Three is enough to expose the differences that matter and few enough to verify each properly. A buyer comparing eight on a spreadsheet is usually comparing price and delivery promises, which are the two things a quotation cannot prove. Cut to three before the site visits, not after.
Should a buyer visit the factory?
Yes, once the shortlist is down to two, and with a specific order in mind rather than a general tour. A visit that follows one order through incoming, in-process, final and packing answers more than a day of presentations, and it should be booked while a batch is running.
What should the first order test?
The first order tests whether the supplier can hold a written specification, so it should include one variable that is easy to get wrong, such as a colour, a label or a packing configuration. A supplier that handles the variable without a conversation is ready for a larger order, and one that asks a clarifying question before quoting is usually the safer partner.
How do you verify a certificate?
Read the legal entity and the scope line, then check the issuing body's public register, and record the date of the check next to the file. A certificate whose holder is not the entity quoting you is not evidence for your order, however recent it looks.
What belongs in the contract before the first shipment?
The specification with its drawing revision, the inspection basis, the party who signs a deviation, the claim window and the documents due with each shipment. Those five turn a relationship into an agreement that can be enforced without a conversation.
What This Guide Does Not Cover
This guide does not quote prices, minimum quantities, lead times or freight costs, and it does not say which supplier a buyer should appoint. Regulatory classification and registration duties differ by market and belong to the buyer and its advisers, not to this page. Certificate numbers are not reproduced here because they change and must be verified at source.
For a sense of what the range looks like, start with the rollator walkers in the range and their specification sheets. How custom projects are run is described in our OEM/ODM programme. Send the product, the market and the volume to request a quote and we reply within one business day.
