Supplier comparisons usually collapse into a price list plus a memory of who replied fastest. A scorecard replaces the memory with a number, and its value lies less in the ranking than in showing which weighting the buyer actually cares about. This guide gives seven criteria, default weights, and a worked example where the leader changes.
What Should the Seven Criteria Be?
The seven criteria below are chosen because each one is observable before an order and each one predicts a different failure after it, which keeps the scorecard from double-counting the same strength.
Technical capability asks whether the supplier works from drawings or from a catalogue. A supplier who can read a drawing and quote a tolerance is a different partner from one who forwards a photo.
Test evidence asks what the supplier can produce for a rated model. A test report with an edition and a lab name scores higher than a certificate of conformity with neither.
Parts availability asks whether a distributor can buy castors, tips and brake assemblies separately. A supplier who sells only complete units pushes the entire aftermarket cost onto the buyer.
Lead time reliability asks for the gap between the quoted and the achieved date across recent orders, not the quoted figure alone.
Capacity and financial stability ask whether the supplier can double an order without subcontraction, and whether it has been operating long enough to have a record.
Price structure asks how the price moves with volume and how many cost lines are visible. A single landed figure hides the parts cost that returns later.
Responsiveness and documentation ask how fast a technical question is answered and whether the answer arrives in writing.
| Criterion | Measures | Default weight |
|---|---|---|
| Technical capability | Drawing literacy | 20 |
| Test evidence | Report quality | 15 |
| Parts supply | Aftermarket access | 15 |
| Lead time record | Date reliability | 15 |
| Capacity | Scale headroom | 10 |
| Price structure | Cost transparency | 15 |
| Documentation | Written answers | 10 |
Source: procurement scorecard design, 2026 (company framework, not audited data)
How Do You Weight Them?
Weights should follow the buyer's own exposure rather than a general idea of importance. A distributor with no service network needs parts supply weighted heavily; a brand owner with a five-year warranty needs test evidence.
Start from a hundred points and allocate against the cost of getting it wrong. If a late shipment costs a season, lead time reliability deserves more than a fifth of the total. If a returned pallet is the main risk, fit-related criteria move up.
Score each criterion on a five-point scale with a written anchor for each point. A score of four should mean something specific, such as a report with a named lab and a current edition, otherwise two assessors will score the same supplier differently.
Score before discussing price. A scorecard filled in after the quotation becomes an argument for the lowest-priced option, and the weighting silently follows the price.
Keep the raw scores visible next to the weighted total. A supplier that leads on one criterion and trails on everything else is a different proposition from one that sits mid-table throughout, and a single total hides that.
Write the weights down before the tenders arrive, and date the document. A weighting agreed in advance is a statement about the buyer's risk; a weighting agreed after the quotations is a rationalisation, and the difference is visible in the file.
| Criterion | Supplier A | Supplier B | Supplier C |
|---|---|---|---|
| Technical | 4 | 3 | 2 |
| Test evidence | 5 | 3 | 2 |
| Parts supply | 3 | 5 | 2 |
| Lead time | 3 | 4 | 3 |
| Capacity | 3 | 4 | 5 |
| Price | 2 | 3 | 5 |
| Documentation | 4 | 3 | 2 |
Source: illustrative scores, 2026 (company framework, illustrative not measured)
What Does the Scorecard Actually Change?
Under the default weights, supplier B leads with 355 points out of a possible five hundred, supplier A follows at 345, and supplier C trails at 290.
Change one weight and the ranking moves. A buyer holding a five-year warranty raises test evidence from fifteen to thirty, taking ten points from price and five from capacity headroom, so the weighting still sums to a hundred. Supplier A now scores 385 against supplier B's 350, because the criterion where A scores full marks carries twice the influence.
That is the useful behaviour of a scorecard. It does not tell the buyer who is better; it tells the buyer which belief is driving the answer, and whether that belief survives being written down.
Reverse it the other way to test the opposite exposure. A distributor with no service capability moves the same fifteen points into parts supply, taking ten from price and five from documentation. Supplier B reaches 385 against A's 350. The two weightings produce the same pair of totals with the leaders swapped, which shows that the ranking describes the buyer rather than the supplier.
Run both weightings before shortlisting. A supplier that leads under neither is not worth a sample, and a supplier that leads under both is worth a visit rather than another email.
| Weighting | First place | Why it moves |
|---|---|---|
| Default | Supplier B | Parts and lead time |
| Warranty-led | Supplier A | Test evidence doubled |
| Service-led | Supplier B | Parts supply doubled |
Source: same illustrative scores, recomputed 2026 (company framework)
Where Does a Scorecard Mislead?
A scorecard is a record of what the buyer thought, and it inherits every bias of the person who filled it in, so the failure modes are worth knowing before it becomes a decision document.
The first is false precision. A total of 355 against 345 looks decisive, but the underlying scores are judgements on a five-point scale, and a two-point difference usually sits inside the noise.
The second is criterion drift. Teams adjust the definition of a criterion until a preferred supplier scores well, and the scorecard then documents a decision made earlier rather than informing one.
The third is missing criteria. A scorecard cannot weigh what nobody thought to include, and the omissions are usually the boring ones: packaging quality, response to a claim, willingness to hold a drawing revision.
The fourth is scale mismatch. A supplier that is excellent for a first order of two hundred units may be unsuitable at two thousand, and a single score blends both scales into one number.
The fifth is a stale record. A scorecard filled in during a tender and never revisited describes a company at one moment, and suppliers change ownership, premises and subcontractors more often than a buyer assumes.
There is a simple discipline that limits all five. Attach one piece of evidence to every score above three, whether a report, a photograph or a dated email, and refuse to accept a score without it. Evidence-backed scores survive a change of assessor; recollected ones do not.
Treat the scorecard as a structured conversation rather than a verdict. Its most useful role is the argument it starts about weights, because that argument is about the buyer's own risk rather than the supplier's marketing.
Frequently Asked Questions
Should the scorecard include price as a criterion?
Yes, but on cost transparency rather than on the headline figure. A supplier that breaks the price into material, component and tooling lines scores higher than one that quotes a single landed number, because the second cannot be compared at a different volume.
How many suppliers should be scored?
Three is usually enough to expose the weighting question and few enough to score properly. Scoring eight suppliers with a half-page each produces less insight than scoring three with evidence attached to every point. If a tender requires more, score the extras on three knock-out criteria only.
Do the scores need to come from a visit?
Not for all seven criteria. Test evidence, parts supply and documentation can be assessed remotely, while capacity and lead time reliability are better confirmed on a visit or through a recent order record. Score what you can see, and mark the rest as unverified rather than guessing.
What if two suppliers tie?
Break the tie on the criterion with the highest weight, not on price. A tie means the buyer has not yet identified the risk that separates them, so the honest answer is to add the missing criterion rather than to default to the cheaper quote.
How often should the scorecard be redone?
Before each new programme and after any claim that was handled badly. A supplier's score moves when its management, its subcontractors or its order book change, and a scorecard older than a year describes a company that may no longer exist in that form.
What This Guide Does Not Cover
This guide does not score any named supplier, does not publish prices, and does not replace a factory audit or a sample evaluation. The scores in the worked example are illustrative rather than measured, and the weights are a starting point rather than a recommendation. Criteria and weights should follow the buyer's own contract terms and market.
For the range these criteria are applied to, start with the rollator product line and its documentation set. How volume tiers and parts supply work in practice is set out in the wholesale sourcing terms. Send your criteria and volumes to request a quote; we reply within one business day.