OEM Compliance RACI: Who Owns Each Decision

8 min · OEM/ODM & Wholesale

Customization moves compliance work between parties without moving legal responsibility with it. The buyer who changes a seat height becomes responsible for a document they did not write, while the factory that made the change holds the process records. This guide sets who decides, who performs and who must be told, and marks where that split fails.

Who Owns Compliance After a Product Is Customized?

The legal manufacturer of the finished product carries compliance responsibility, and customization does not transfer it to the factory that performs the work.

That sentence is the whole argument, and it surprises buyers who assume a private label purchase moves the liability to the supplier. It does not. Whoever places the product on the market, under whose name, answers for the technical file.

The factory's role is to hold the process and the evidence: the quality management system certificate, the process records, the test reports it commissioned, and the change history. It performs and it evidences; it does not decide on the buyer's behalf.

The test house is a third party with a narrower role than most buyers expect. It tests what it is asked to test and reports results; it does not decide whether the product may be sold, and a report is not a certificate.

Decision, execution and notification
DecisionBuyerFactoryTest house
Market and classificationACI
Technical file contentARC
Process control recordsIAI
Test scope and samplesARR
Change impact assessmentARC

Source: SunnyPeak Care OEM/ODM project terms, 2026 (company statement)

Read the letters as roles rather than as rank. The buyer is accountable, the factory is responsible for doing the work, the test house is consulted, and information flows to whoever is marked I.

The matrix is worth agreeing in writing before the first sample, because customization projects fail on assumptions about who was going to do the paperwork rather than on the product.

Which Decisions Belong to the Buyer?

Four decisions belong to the buyer and cannot be delegated without becoming a different product: the market, the classification, the intended use statement and the risk acceptance.

The market decision sets everything downstream. Selling a walking aid into the European Union brings it under EU MDR 2017/745, while selling the same aid into a market with a lighter regime produces a different file, different labelling and a different test scope.

Classification follows the market and the intended use, not the parts list. A shower chair sold as bathroom furniture and the same chair sold as a medical device carry different documentation, and the label is what tells a regulator which one you sold.

The intended use statement is short and decides more than any drawing. Words such as patient, therapy or clinical use pull a product toward device status, while household and daily living pull it away.

Risk acceptance is the buyer's signature even when the analysis is shared. Accepting that a residual risk is tolerable is a commercial and legal act, and a factory cannot perform it on the buyer's behalf.

Decisions that stay with the buyer
DecisionWhy not delegatedOutput
Target marketSets the applicable regimeMarket list
ClassificationFollows intended useClass rationale
Intended use wordingDrives device statusLabel and IFU
Residual risk acceptanceLegal actSigned assessment

Source: Regulation (EU) 2017/745, Annex I and Annex II (structure of the technical documentation)

Two of those four are usually decided by accident. The market list grows because a distributor asks for a country, and the intended use wording drifts because a copywriter edited a listing.

What Does the Factory Actually Control?

The factory controls the process, the evidence it generates and the changes it makes, which is a narrower scope than buyers assume and a wider one than factories usually claim.

Process control is the factory's genuine responsibility. Incoming inspection, in-process checks, final inspection and the records behind them sit with the producer, and a quality management system certificate such as ISO 13485:2016 describes that system rather than the product.

Certificates belong to the certificate holder, and that distinction matters in a private label order. An ISO 13485:2016 quality management system certificate held by the manufacturing partners covers the scope stated on it, per product, and the buyer's name does not appear on it.

Changes are the factory's to record and the buyer's to approve. A supplier who substitutes a tube wall thickness without telling the buyer has made a technical change to a product the buyer is accountable for, which is the definition of a compliance failure.

Customization items map onto that matrix unevenly. A logo printed on an unchanged part is a labelling change and rarely triggers retesting, while a change to the packaging structure can alter the transport test the product was approved under. A new instruction language changes the label compliance the buyer signs for. Order structure stays commercial, with volumes, call-offs and packaging marks decided by the buyer alone.

Records also have a retention life, and the buyer should ask what it is. A process record kept for three years supports a claim made in year two and fails the one made in year four, which matters for a product with a five-year service life.

What the factory holds, and what it does not
ItemFactory holdsNot held
Process recordsYes, per lotBuyer's market decision
QMS certificateYes, scope statedProduct approval
Test reportsWhen commissionedDeclaration of Conformity
Change historyYes, per projectRisk acceptance

Source: ISO 13485:2016, quality management system requirements; SunnyPeak Care OEM/ODM project terms, 2026 (company statement)

Testing sits between the two parties and is often misread. A factory that orders a load test receives a report on the samples submitted, while the buyer who needs that report for a technical file has to confirm the sample was representative of production.

Under EU MDR 2017/745 the position of a third party depends on the class. Class I devices that are not sterile and have no measuring function are supported by the manufacturer's own technical documentation without a notified body, while higher classes bring one in, and the buyer who assumes otherwise plans the wrong timeline.

Where Does Responsibility Break Down?

Ownership breaks at three points: the specification handover, the change approval, and the moment a distributor asks for a document nobody wrote.

The specification handover is the first break. A buyer sends a drawing and a colour reference, the factory builds to its own interpretation, and the difference appears at the sample stage as a disagreement about what was ordered.

Change approval is the second. Customization projects generate changes continuously, and a change approved in an email chain is a change with no owner, no impact assessment and no re-test decision.

The document request is the third and the most expensive. A distributor asks for a Declaration of Conformity in a market the buyer never listed, and the gap is discovered after the goods have shipped.

Three break points and the fix
Break pointSymptomFix
Specification handoverSample disagreementSigned annex before tooling
Change approvalSilent substitutionOne change form, one approver
Late document requestShipment heldMarket list agreed at quote

Source: SunnyPeak Care OEM/ODM project terms, 2026 (company statement)

A single change form solves more than a procedure manual. One page carrying the change, the affected documents, the re-test decision and two signatures closes the second break without adding a meeting.

The market list belongs in the quotation rather than in the contract negotiation. Listing the countries at the quote stage forces the document question early, when a missing test costs a week rather than a container.

Frequently Asked Questions

Does private label make the supplier the legal manufacturer?

No. The brand on the label and the entity placing the product on the market carry the manufacturer obligations, and the factory remains the producer. Buyers should confirm this split in writing rather than infer it from who issues the invoice.

Who writes the Declaration of Conformity?

The legal manufacturer signs it, which is normally the buyer in a private label arrangement. The factory supplies the underlying test reports and process evidence, and a supplier who offers to sign a declaration in the buyer's name is describing an arrangement worth questioning.

Does a customization always require new testing?

Not always, but the decision has to be recorded rather than assumed. Changes to a structural part, a load path or a material usually require re-testing, while a colour or a logo on an unchanged part usually does not. Record the decision even when the answer is no.

How long does compliance work add to an OEM project?

Plan several weeks beyond the production window when a new test is needed, because the test itself is short and the sample, shipping and review around it are not. Projects that skip this step lose the time at the port instead.

What should be in a change approval form?

The change, the reason, the affected parts and documents, the re-test decision, the effective date and two signatures. Anything shorter becomes a notification rather than an approval, and notification is what buyers complain about after delivery. One signature should be the buyer's and one the factory's.

What This Guide Does Not Cover

This guide does not determine the classification of any product, state which tests a given market requires, or replace legal review of a technical file. Regulatory pathways for specific destinations change and are assessed per product and per market. Responsibility described here is commercial allocation and does not alter statutory obligations.